Walker Dairy
CEM is developing a renewable energy project which will be capable of providing up to 4.99MW of continuous, reliable electricity to the local electrical distribution network. The project will be capable of cogenerating heat for the host facility and will be prepared for future carbon capture to generate carbon negative electricity in the future.
Nameplate Capacity: 4.99 MW
Technology: Biogas Fuelled Reciprocating Engine
Legal Name of Proponent: Cogeneration and Energy Management Engineering Inc. (DBA CEM Engineering)
Contact of Proponent: Matt Lensink, P. Eng., Chief Executive Officer,
Email: matt@cemeng.ca, Mobile 289-668-4364
301 – 25 Corporate Parke Drive, St. Catharines, ON
Scale map showing the boundaries of the Project Site, with Location of the Connection Point and the Connection Line